The short version
- In Bengaluru, your commute decides your quality of life. Live near work, or near a metro station on a line that reaches it.
- Before you sign, check the trip in Google Maps with "Depart at" set to your real weekday start time.
- Four metro lines run today: Purple, Green, Yellow and, since 14 November 2026, the first stretch of Pink. The Outer Ring Road line and the rest of Pink are due in 2027. Check any trip in our metro fare calculator.
The metro right now
- Purple Line: Whitefield (Kadugodi) to Challaghatta, through KR Puram, Indiranagar, MG Road, Majestic and Mysuru Road.
- Green Line: Madavara to Silk Institute, through Peenya, Yeshwantpur, Malleshwaram, Majestic, Jayanagar and JP Nagar.
- Yellow Line: RV Road to Bommasandra, through Silk Board, Hosa Road and Electronic City.
- Pink Line, first stretch: Kalena Agrahara to S G Palya (planned as Tavarekere) along Bannerghatta Road, open since 14 November 2026. The underground section from Dairy Circle to Nagawara is expected around March to May 2027.
- Blue Line: the Outer Ring Road section, Silk Board to KR Puram, began trial runs in November 2026 and is due around May 2027. The airport section isn't expected before late 2027.
Change lines at Majestic (Purple and Green), RV Road (Green and Yellow) and Jayadeva Hospital (Yellow and Pink). For buses, autos and the airport, read Getting around.
Metro dates slip. Treat every "due" date as a hope, not a promise. We update this page when a line actually opens.
Pick by where you work
| Work hub | Where people live | Metro today | Rent level |
|---|---|---|---|
| Whitefield, ITPL, Brookefield | Whitefield, Brookefield, Hoodi, Mahadevapura, KR Puram | Purple | ₹₹ |
| Outer Ring Road (Marathahalli to Bellandur) | Bellandur, HSR Layout, Kadubeesanahalli, Marathahalli, Sarjapur Road | None yet; Blue due 2027 | ₹₹ to ₹₹₹ |
| Electronic City | Electronic City, Hosa Road, Bommanahalli, BTM Layout, HSR Layout | Yellow | ₹ to ₹₹ |
| Manyata, Hebbal, Nagawara | Hebbal, Thanisandra, Hennur, RT Nagar, Sahakara Nagar | None yet; Pink due 2027 | ₹₹ |
| Central: MG Road, Indiranagar, Koramangala | Indiranagar, Domlur, Koramangala, Ulsoor, Jayanagar | Purple | ₹₹₹ |
| Bannerghatta Road, JP Nagar | JP Nagar, Bannerghatta Road, BTM Layout, Hulimavu, Jayanagar | Pink, Green | ₹₹ |
| North and airport side | Yelahanka, Jakkur, Hebbal | None yet | ₹ to ₹₹ |
| West: Peenya, Yeshwantpur, Rajajinagar | Rajajinagar, Malleshwaram, Yeshwantpur, Vijayanagar | Green, Purple | ₹ to ₹₹ |
Rent levels are rough and relative for a 2BHK (₹ cheaper, ₹₹₹ priciest). Check live listings for real numbers.
What matters more than the area's name
- Water. Ask whether the building gets Cauvery water or depends on borewells and tankers in summer. Tanker-dependent buildings get expensive and stressful in a dry year.
- Power backup. Ask if the society has generator backup for lifts and lights, and whether your flat has an inverter.
- Flooding. Some low-lying roads flood in heavy rain. Ask a neighbour, or search the street name with "flooding".
- Society or independent house. Gated societies give security, backup and amenities, with rules and a monthly maintenance fee. Independent houses are often cheaper, and the owner usually lives in the same building.
- Visit at night once. Walk from the main road to the gate after dark before you commit.
Next step
Once you have two or three areas, read Renting a flat and work out your move-in costs.
Sources
- Siasat, Pink Line's 7.5 km stretch opens 14 November 2026
- OneIndia, Namma Metro crosses 100 km with the Pink Line
- Swarajya, Pink underground and ORR line set for May 2027
Spotted something wrong or out of date? Email hello@allaboutbangalore.com and we'll check it, fix it and update the date.